The project CONTRACT WW99F – Lot 1B chose DFHB Centrifugally Casting Pipes for Mauritius Wastewater Treatment Plant. It is the second Cooperation between DFHB and BCEG. This project total use 3138m pipes and 194pcs fittings ranges from DN350 to DN600. The pipes and fittings was shipped by 40 ft conventional containers within 30 days after the contract signed. The customer was satisfied with our fast delivery.